PERMIT NO:
 B20-0568
ONLINE PERMIT
  CITY OF MARYSVILLE
   501 Delta Ave
   City of Marysville, WA 98270

Permitting
(360) 363-8223
SCHEDULE INSPECTION
ONLINE
https://permits.marysvillewa.gov/
PERMIT TYPE
  APARTMENT

PERMIT SUB-TYPE
    NEW

JOB VALUE     1184208.3
APN     31052000301800
DESCRIPTION
    THE LODGE P4 BLDG NN - 12 UNITS
APPLIED DATE
11/20/2020

APPROVED DATE
1/11/2021

ISSUED DATE
12/16/2021

PERMIT NOT VALID UNLESS ISSUED DATE PRINTED
 
Seal    
 
    PERMIT INFORMATION
FEE SUMMARY
    SITE 17501 19TH AVE NE BLDG NN

    APPLICANT RUTLEDGE MAUL ARCHITECTS PS INC
19940 BALLINGER WAY NE
SHORELINE WA 98155

    OWNER SMOKEY POINT APARTMENTS IV, LLC
1457 130TH AVE NE
BELLEVUE WA 98005

    CONTRACTOR WINDSOR CONSTRUCTION COMPANY
14711 NE 29TH PLACE; STE 202
Bellevue WA 98007
BLDG PERMIT FEES$9,149.12
STATE ISSUANCE FEE$28.50
BLDG PERMIT FEES$1,000.00
LAKEWOOD SCH MIT.$19,792.00
PARKS MIT.$13,128.00
PLANNING TRAFFIC MIT$42,336.00
Total Fees Collected:$85,433.62
NOTICE:
This permit is issued by the Building Official and, under the provisions of the International Building Code and International Residential Code, shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of permit issuance, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. By affixing my signature, I hereby certify that I am the owner of the property for which this permit is issued or am an authorized representative of the owner. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not, including routine calls for inspections.

NOTE:  Issuance of this permit is subject to field inspections, corrections and approvals under MMC, Chapter 16-Building Code.  Once an inspection is performed and it is determined by the city that additional permits are required, it is the applicant's responsibility to apply for any necessary permits to assure code compliance has been met.

Once issued, permission is hereby given to do the above work, according to the conditions hereon, subject to compliance with the ordinances of the CITY OF MARYSVILLE.

INSPECTION REQUEST: Inspections are requested via the Permit Portal. Copy and paste the following link in your browser: https://permits.marysvillewa.gov/

Inspection requests are to be submitted no later than 3:00pm in order to be scheduled for the next business day.

INSPECTION REQUEST INSTRUCTIONS - http://docs.marysvillewa.gov/htcomnet/public/?folder=601b00d9
 
SIGNATURE OF APPLICANT OR AGENT:___________________________________________
 
DATE:___________________________




   
    
   
INSPECTION SUMMARY

______  FOUNDATION FOOTING
______  FOUNDATION SETBACK
______  FOUNDATION UFER GROU
______  FOUNDATION WALL
______  DRAINAGE FOOTLINE
______  DRAINAGE TIGHTLINE
______  INSULATION SLAB
______  TENTING INSPECTION
______  FRAME ROUGH FRAMING
______  INSULATION STRUCTURE
______  FRAME ROUGH FRAMING
______  FRAME ROUGH FRAMING
______  INSULATION STRUCTURE
______  GYPSUM/WALLBOARD
______  INSULATION STRUCTURE
______  GYPSUM/WALLBOARD
______  GYPSUM/WALLBOARD
______  CEILING GRID
______  GYPSUM/WALLBOARD
______  CEILING GRID
______  MECH FANS/DUCTS
______  CEILING GRID
______  MECH FANS/DUCTS
______  CEILING GRID
______  CEILING GRID
______  **FINAL CLOSEOUT
Permit Finaled Date:  __________    Building Official:  __________________    Signature:  __________________