PERMIT NO:
 G19-0009
ONLINE PERMIT
  CITY OF MARYSVILLE
   501 Delta Ave
   City of Marysville, WA 98270

Permitting
(360) 363-8223
SCHEDULE INSPECTION
ONLINE
https://permits.marysvillewa.gov/
PERMIT TYPE
  GRADING

PERMIT SUB-TYPE
    RESIDENTIAL GRADING

JOB VALUE     87000
APN     29050200201800
DESCRIPTION
    WYNDHAM HILLS - GRADING
APPLIED DATE
2/12/2019

APPROVED DATE
4/20/2021

ISSUED DATE
4/22/2021

PERMIT NOT VALID UNLESS ISSUED DATE PRINTED
 
Seal    
 
    PERMIT INFORMATION
FEE SUMMARY
    SITE XXXX 44TH ST NE GRADING

    APPLICANT KEYSTONE LAND LLC
13805 Smokey Point Blvd; STE 101
MARYSVILLE WA 98271

    OWNER KEYSTONE LAND LLC
13805 Smokey Point Blvd; STE 101
Marysville WA 98271

    CONTRACTOR OMNI CONTRACTING SOLUTIONS LLC
3726 Broadway Suite 301
Everett WA 98201
CONSTR INSPECTION$12,000.00
GRADING$1,600.00
Total Fees Collected:$13,600.00
NOTICE:
This permit is issued by the Building Official and, under the provisions of the International Building Code and International Residential Code, shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of permit issuance, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. By affixing my signature, I hereby certify that I am the owner of the property for which this permit is issued or am an authorized representative of the owner. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not, including routine calls for inspections.

NOTE:  Issuance of this permit is subject to field inspections, corrections and approvals under MMC, Chapter 16-Building Code.  Once an inspection is performed and it is determined by the city that additional permits are required, it is the applicant's responsibility to apply for any necessary permits to assure code compliance has been met.

Once issued, permission is hereby given to do the above work, according to the conditions hereon, subject to compliance with the ordinances of the CITY OF MARYSVILLE.

INSPECTION REQUEST: Inspections are requested via the Permit Portal. Copy and paste the following link in your browser: https://permits.marysvillewa.gov/

Inspection requests are to be submitted no later than 3:00pm in order to be scheduled for the next business day.

INSPECTION REQUEST INSTRUCTIONS - http://docs.marysvillewa.gov/htcomnet/public/?folder=601b00d9
 
SIGNATURE OF APPLICANT OR AGENT:___________________________________________
 
DATE:___________________________




   
    
   
INSPECTION SUMMARY

______  IDDE SCREENING
______  BMP INSPECTION
______  BMP INSPECTION
______  BMP INSPECTION
______  BMP INSPECTION
______  BMP INSPECTION
______  Water Tested
______  BMP INSPECTION
______  Walk Through
______  ASBUILT ACCEPTANCE
______  San sewer Installed
______  SITE VISIT
______  BMP INSPECTION
______  20' PARKING CLEARAN
______  24" AISLE WIDTH
______  6-MONTH RES
______  ABOVE GR CERT
______  ABOVE GR HYDROSTATIC
______  ABOVE GR VISUAL
______  ACCEPT "B" LIFT
______  ACCEPT ATB
______  ACCEPT ROW
______  ACCEPT SAN SEWER
______  ACCEPT STORM
______  ACCEPT STRIPING
______  ACCEPT WATER
______  AIR SEALING
______  ANNUAL FACILITY INSP
______  APPROVED FIREWORKS L
______  APVD PORTABLE HTRS
______  ATB INSTALLED
______  BATTERY POWERED EQUP
______  BMP INSPECTION
______  CLEAR OF COMBUSTIBLE
______  CURBS AND SIDEWALK
______  DEVICE ROUGH-IN
______  DISPENSER INSTALL
______  DRAINAGE CONNECTION
______  DRAINAGE FOOTLINE
______  DRAINAGE OTHER
______  DRAINAGE TIGHTLINE
______  EDUCATION/OUTREACH
______  ELECT - TEMPORARY PO
______  ELECT - UFER GROUND
______  ELECT- SERVICE INSPE
______  ELECT-FINAL
______  ELECT-ROUGH-IN
______  ELECT-UNDERGROUND
______  EMERGENCY SIGN
______  EROSION CONTROL
______  FINAL
______  FINAL ACCEPT TEST
______  FINAL BUILDING
______  FINAL ENGINEERING
______  FINAL PLANNING
______  FINAL SIDEWALKS
______  FIRE ALARM ROUGH WIR
______  FIRE EXTINGUISHERS
______  FIRE PUMP ACC TEST
______  FIRE SPKLR -THRUST B
______  FIRE-ALARM ROUGH COV+
______  FIRE-DISPENSER INSTA
______  FIRE-FINAL
______  FIRE-HYDRANT FLOW TE
______  FIRE-HYDRANT FLUSH
______  FIRE-HYDRANT STORTZ
______  FIRE-LETTER/CONV&COM
______  FIRE-PIPE PRES/LEAK
______  FIRE-SPKLR ABV GRD H
______  FIRE-SPKLR ABV GRD O
______  FIRE-SPKLR ABV GRD V
______  FIRE-SPKLR FIRE PUMP
______  FIRE-SPKLR SYSTEM AC
______  FIRE-TANK INSTL/REMO
______  FIRE-UNDGRD SPKLR FD
______  FIRE-UNDGRD SPKLR FD
______  FIRE-UNDGRD SPKLR MA
______  FIRE-UNDGRD SPKLR MA
______  FOLLOW UP INSP
______  FOUNDATION FOOTING
______  FOUNDATION SETBACK
______  FOUNDATION TIE DOWNS
______  FOUNDATION WALL
______  FRAM ROOF/WALL SHEA
______  FRAM 1ST FL JOIST
______  FRAM ROUGH FRAMING
______  GYPSUM/WALLBOARD
______  HAZ MAT
______  HMIS SUBMITTED
______  HYDROSEED OR STRAW
______  INSTALL SIGNS
______  INSUL.SEIS. CELING G
______  INSULATION SLAB
______  INSULATION STRUCTURE
______  LETTER OF COMPLETION
______  MAPPING INSPECTION
______  MECH FANS/DUCTS/FRNC
______  MECH FINAL
______  MECH FURNACE
______  MECH GAS PIPE
______  OUTSIDE UTILITIES
______  PIPING PRESSURE/LEAK
______  PLUMBING CONNECTION
______  PLUMBING FINAL
______  PLUMBING GROUNDWORK
______  PLUMBING OTHER
______  PLUMBING ROUGHIN
______  PLUMBING WATER SERVI
______  POSTED PERMITS
______  POSTUTIL-WAT/SS TEST
______  PUNCH LIST
______  PURITY TEST
______  RIGHT OF WAY
______  ROUGH-IN BOOTH/AREA
______  SAN SEWER INSTALLED
______  SAN SEWER TESTED
______  SANITARY SEWER TV'D
______  SED DMG POTENTIAL
______  SETBACK CLEARANCE
______  SIDE SEWER
______  SIGNS ELECTRICAL
______  SITE VISIT
______  STORM SYS INSTALLED
______  SUPRESSION SYST TEST
______  SW ENFORCEMENT
______  SYSTEM ACC TEST
______  TANK INSTALL/REMOVAL
______  U.G1/JOINT RESTRAINT
______  U.G1/PIPE MATERIALS
______  U.G1/THRUST BLOCKING
______  U.G2/CERTIFICATION
______  U.G2/SPKLR FDC FLUSH
______  U.G2/SPKLR FDC HYDRO
______  U.G2/SPKLR MN FLUSH
______  U.G2/SPKLR MN HYDRO
______  WALK THROUGH
______  WATER INSTALLED
______  WATER TESTED
______  ASBESTOS SURVEY
______  DRAINAGE CONNECTION
______  DRAINAGE FOOTLINE
______  DRAINAGE TIGHTLINE
______  ELECTRICAL
______  ELECTRICAL FINAL
______  ELECTRICAL LOW VOLTA
______  ELECTRICAL ROUGH-IN
______  FINAL BUILDING
______  FINAL ELECTRICAL
______  FINAL ENGINEERING
______  FINAL HEALTH DEPT
______  FINAL LOW VOLTAGE
______  FINAL PLANNING
______  FINAL SIDEWALKS
______  FINAL UTILITIES
______  FINAL WWTP
______  FIRE ALARM ROUGH-IN
______  FOUNDATION FOOTING
______  FOUNDATION SETBACK
______  FOUNDATION UFER GROU
______  FOUNDATION WALL
______  FRAME 1ST FL JOIST
______  FRAME ROOFWALL SHEAR
______  FRAME ROUGH FRAMING
______  FRAMING
______  GAS PIPE
______  GUTTERS/DOWNSPOUTS
______  GYPSUM/WALLBOARD
______  CEILING GRID
______  INSULATION SLAB
______  INSULATION STRUCTURE
______  LANDINGS/STAIRS/RAMP
______  LOW VOLTAGE ROUGH-IN
______  MARRIAGE LINE
______  MECH FANS/DUCTS
______  MECH FURNACE
______  MECH GAS PIPE
______  MECHANICAL CONNECT
______  MECHANICAL FINAL
______  PIER BLOCKS
______  PLUMBING CONNECTION
______  PLUMBING FINAL
______  PLUMBING GROUNDWORK
______  PLUMBING OTHER
______  PLUMBING ROUGH-IN
______  SECURITY ROUGH-IN
______  SKIRTING
______  T-STAT
______  TIE-DOWNS
______  UTILITIES CUT&CAPPED
______  WATER SERVICE
______  SITE INSPECTION
______  PRECON
______  ASBUILT ACCEPTANCE
______  ASBUILT REVIEW
______  STORM BOS
______  SEWER BOS
______  WATER BOS
______  HYDRONIC LINE
______  FINAL SPEC INSP
______  TENTING INSPECTION
______  SITE VISIT OT
______  IDDE SCREENING
______  PERMIT ON HOLD
______  FIRE BLS
______  BUILDING BLS
______  PLANNING BLS
______  TRAFFIC
______  GIS MAPPING VERIFIED
______  MECH - HOT WATER HEATER
______  PLUMB - HOT WATER HEATER
______  BMP INSPECTIONS 2
______  PERMIT EXIRED
______  UG THRUST BLOCK
______  UG HYDRO MAIN
______  UG HYDRO FDC
______  UG BALL DRIP
______  UG FLUSH MAIN
______  UG FLUSH FDC
______  UG CERT
______  AG HYDRO
______  AG VISUAL
______  AG TENTING
______  SYS ACC TEST
______  AG CERT
______  DEVICE ROUGH IN
______  NFPA 72 RECORD OF COMPLETION
______  HOOD ACC TEST
______  ERRC ACC TEST
______  CLEAN AGENT ACC TEST
______  TANK REMOVAL/INSTALL
______  DECOM LIFE SAFETY SYS
______  PNEUMATIC LEAK TEST
______  ASBUILT ACCEPTANCE
______  **FINAL CLOSEOUT
______  100' DISCHARGE SIGN
______  16 YR AGE REST/ID RE
______  20' GAS/5 GAL MAX R
______  20' GENERATOR RESTR
______  20' NO SMOKING SIGN
______  FIRE FINAL
______  FINAL FIRE
______  FINAL FIRE DEPT
______  FINAL FIRE
______  6-MONTH RES
______  FINAL ENGINEERING
______  FINAL PLANNING
______  FINAL BUILDING
Permit Finaled Date:  __________    Building Official:  __________________    Signature:  __________________